This doc applies to Manual State Link only.
You use Manual State Link to keep your physical inventory, your Greenbits inventory, and Metrc in sync. There are very specific workflows to follow when you use Manual State Link. This workflow doc should be the centerpiece of your day with Greenbits.
Follow these workflows in this order, so your sales and adjustments .csv uploads don't fail.
Throughout your day
- Receive inventory and associate it with Products.
- Split packages for return or transfer:
- Split and transfer in Metrc.
- Split in Greenbits.
- Mark the transferred item as Transferred out in Greenbits.
- Merge packages with the same unit of measure, if needed:
- Merge the packages first in Metrc
- Then, merge the packages in Greenbits.
- Convert bulk flower into pre-rolls or units into pre-packs, if needed.
End of your day
- If you need to, make any adjustments.
- Report your sales.
- Report your adjustments.
- Finish your zero packages in Metrc.
- Close the same packages in Greenbits.
Comments
0 comments
Please sign in to leave a comment.